Customization: | Available |
---|---|
Application: | High-voltage |
Material: | Silicone Rubber |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Shed connected with core by integral foring
2. The thinkness of housing > 3mm,unifirm to IEC Standard
3. Acid resistant,hight temperature resistant of epoxy fiberglass core
4. Metal end fittings,core and sheds connected by new crimping process
5. Hot galvanization and technology of rareearth aluminum coating to avoid coating shedding prolonging the service life
x
(1)Small volume,light weight,sheds have good elasticity,not broken,con venient transportation and installation, economy.
(2)High mechanical strength FRP ROD has high tensile strength, small size,light
weight,high tensile strength.
(3)High antifouling property,good aging resistance performance,high anti pollution flashover voltage , good electric corrosion resistance.
(4)Easy installation,greatly reduce mainternance charges and manual labor intensity.
(5)Simple production process,short delivery time.
Basic Data
Service
Choose our products! You'll get
1) Good quality guarantee (2 years)
2) Factory direct prices
3) On time delivery
4) Free sample
5) Professional technology support
Strict quality controls have been taken to ensure that you'll get reliable products.
a. Material checks before production .
b. Random inspection during production .
c. Inspection before the shipment.
Our products fully comply with well recognized standards such as IEC, BS, ANSI.
FAQ:
1. Q: Do you have a catalog? Can you send me the catalog to have a check of all your products?
A: Yes, We have product catalog. Please contact us, we'll send our catalog by E-mail.
2 Q: I can't find the product on your catalog, can you make this product for me?
A: Our catalog shows most of our products but not all. If you couldn't find it, let us know the specification of your requirements, it usually takes 20-30 days for us to design and make new moulds which match your requirements.
3 Q: What's your payment term?
A: The price FOB Ningbo under payment term is 50% T/T in advance and the balance before shipment.