DRAWING
This model is suitable for switching and protecting LVoverhead lines, and/or to
include a protection when doing a connection to low voltage underground
systems.
The design of this equipment allows the opening and closing of the three phases
simultaneously and independently from the neutral, which is clearly identified to
prevent its disconnection in rigidly landed systems. If required, it can be easily
transformed in a single phase operation switch as the standard model APDM
400T.
It can be connected with terminals lugs (APDM400T-3) or directly with its connectors (APDM400T-3C).
Each phase and the neutral have an indicator which
show if the fuse or the blade are installed. The closure
of the cap allows the switch to be closed with or without
the fuse preventing the risk of leaving live parts
exposed.
It can also be provided with a led to show the fusion of
the fuses.
Why Choose Ziyong Technology
1) Professional operation experience
2)Good quality guarantee (2 years)
3)Free sample are available and available for quality test
4) Safe packaging and Prompt delivery
5) All size can be customised
6) Choose our products! You'll get Professional technology support
Quality guaratee
Strict quality controls have been taken to ensure that you'll get reliable products.
a. Material checks before production.
b. Random inspection during production.
c. Inspection before the shipment.
Our products fully comply with well recognized standards such as IEC, BS, ANSI,CE,RoHs
FAQ:
1. Q: Do you have a catalog? Can you send me the catalog to have a check of all your products?
A: Yes, We have product catalog. Please contact us, we'll send our catalog by E-mail.
2 Q: I can't find the product on your catalog, can you make this product for me?
A: Our catalog shows most of our products but not all. If you couldn't find it, let us know the specification of your requirements, it usually takes 20-30 days for us to design and make new moulds which match your requirements.
3 Q: What's your payment term?
A: The price FOB Ningbo under payment term is 50% T/T in advance and the balance before