Product show
Specifications
Pre-insulated sleeve
1. Type: MJPB
2. Material: AL
3. Function: To connect the insulated cable
Introduction
Pre-insulated sleeve is designed to connect the insulated cable(include ABC cable) in aerial distribution network...It is in accordance with NF33-021. The sleeve is without tension. And its cap can prevent the water into the barrel. It is colored differently to distinguish the cable sizes
Specifications
Bimetallic cable lug is suitable for the conjunction of wires cable in the distribution equipment and the electrical equipment. And suitable for transition connection of circular aluminum wires, hemicycle-sector aluminum wires, power supply cables in the distribution equipment and copper terminals of the electrical equipment
Marked with type, cable size, die size, inner cable length and number of crimping
1) Application: Connection of copper conductor (section 1.5-1000mm2) in power cable with electronic equipment
2) Material: >99.9% pure copper tube T2, good conductivity
3) Surface Treatment: Tinned, corrosion resistance
4) Working Temperature: -55 C-150 C
5) Certificate: ISO9001-2000
6) Manufacturer: Price advantage
Why Choose Ziyong Technology
1) Professional operation experience
2)Good quality guarantee (2 years)
3)Free sample are available and available for quality test
4) Safe packaging and Prompt delivery
5) All size can be customised
6) Choose our products! You'll get Professional technology support
Quality guaratee
Strict quality controls have been taken to ensure that you'll get reliable products.
A. Material checks before production.
B. Random inspection during production.
C. Inspection before the shipment.
Our products fully comply with well recognized standards such as IEC, BS, ANSI, CE, RoHS
FAQ:
1. Q: Do you have a catalog? Can you send me the catalog to have a check of all your products?
A: Yes, We have product catalog. Please contact us, we'll send our catalog by E-mail.
2 Q: I can't find the product on your catalog, can you make this product for me?
A: Our catalog shows most of our products but not all. If you couldn't find it, let us know the specification of your requirements, it usually takes 20-30 days for us to design and make new moulds which match your requirements.
3 Q: What's your payment term?
A: The price FOB Ningbo under payment term is 50% T/T in advance and the balance before shipment.