DC clamps are designed to anchor LV-ABC lines with insulated neutral messenger. The clamp consists of an aluminium alloy cast body and self-adjusting plastic wedges which clamp the neutral messenger without damaging its insulation.
The flexible stainless steel bail protected by plastic wear-resistant saddle allows installations of up to 3 clamps on a bracket.
The clamp and the bracket are available either separately or together as assembly.
Material: High strength aluminium alloy, nylon plus fiber glass, stainless steel
Drawing
Type |
Cross-section(sqmm) |
JMA157 |
2*16-35 |
JMA158 |
4*16-35 |
JMA160 |
2*16-35 |
JMA161 |
4*16-35 |
Basic Data
Features
• Tool free installation
• Not lose parts
• Exceeds requirements according to EN 50483-3 and NFC 33 041
• Clamp body made of corrosion resistant aluminium alloy, bail of stainless steel, wedges of weather and UV resistant polymer
• Universal fixing of bracket by 2 bolts M14 or stainless steel straps of 20 x 0.7 mm.
• Bracket made of corrosion resistant aluminium alloy
• Maximum line deviation angles of 50° for single and 100° for double anchoring:
Service
Choose our products! You'll get
1) Good quality guarantee (2 years)
2) Factory direct prices
3) On time delivery
4) Free sample
5) Professional technology support
Strict quality controls have been taken to ensure that you'll get reliable products.
a. Material checks before production.
b. Random inspection during production.
c. Inspection before the shipment.
Our products fully comply with well recognized standards such as IEC, BS, ANSI.
FAQ:
1. Q: Do you have a catalog? Can you send me the catalog to have a check of all your products?
A: Yes, We have product catalog. Please contact us, we'll send our catalog by E-mail.
2 Q: I can't find the product on your catalog, can you make this product for me?
A: Our catalog shows most of our products but not all. If you couldn't find it, let us know the specification of your requirements, it usually takes 20-30 days for us to design and make new moulds which match your requirements.
3 Q: What's your payment term?
A: The price FOB Ningbo under payment term is 50% T/T in advance and the balance before shipment.