JMA2-95
Typical Application:
Overhead low voltage insulated wire (cable) connection
Low-voltage insulation T line access
Building power distribution system cable support
Underground low voltage insulated wire (cable) connection
Street lighting system
Easy To Install:
No need to strip the insulation of the cable to do the cable branch, the connector is completely insulated.
Do not need to cut off the cable, you can branch at any position of the cable.
Easy to install and reliable, just use socket wrench, can be charged to install.
Use Safe:
Joint anti-distortion, shockproof, waterproof, anti-galvanized aging, without maintenance.
Has been successfully used for 30 years.
Cost Savings:
Installation space is minimal, saving bridge and civil costs.
Construction applications, do not need the terminal box, sub-line box, do not need the cable back to the line, save cable investment.
The cable + clamp costs less than other power supply systems.
Standard:
French standard, NFC33020
GB9327.1-88 GB9327.2-88 GB9327.3-88 GB2317-85 GB2123-4
Certified product:
EU CE certification ISO 9001-2008
CAT.NO |
CONDUCTORS MAIN mm2 |
BRANCH |
PIERCING DEPTH mm2 |
PATING CURRENT
A |
WEIGHT G |
PACKAGE |
JMA2-95 |
16-95 |
4-35(50) |
≥3 |
200 |
182 |
100 |
Why Choose Ziyong Technology
- Professional operation experience.
- Free sample are available.
- All size can be customised.
- Safe packaging.
- Prompt delivery.
Service
Choose our products! You'll get
1) Good quality guarantee (2 years)
2) Factory direct prices
3) On time delivery
4) Free sample
5) Professional technology support
Strict quality controls have been taken to ensure that you'll get reliable products.
a. Material checks before production.
b. Random inspection during production.
c. Inspection before the shipment.
Our products fully comply with well recognized standards such as IEC, BS, ANSI.
FAQ:
1. Q: Do you have a catalog? Can you send me the catalog to have a check of all your products?
A: Yes, We have product catalog. Please contact us, we'll send our catalog by E-mail.
2 Q: I can't find the product on your catalog, can you make this product for me?
A: Our catalog shows most of our products but not all. If you couldn't find it, let us know the specification of your requirements, it usually takes 20-30 days for us to design and make new moulds which match your requirements.
3 Q: What's your payment term?
A: The price FOB Ningbo under payment term is 50% T/T in advance and the balance before shipment.